Exterior Cleaning Scope of Work: What to Include
· Exterior Drone Washing


An exterior cleaning scope of work is the written list of what a contractor will clean on your building, how, how often, with what access method, and to what standard you will accept the result. A good one names every surface, states the method and the access equipment, sets a measurable finish, and says who pays when something changes. A weak one says “clean building exterior” and leaves the rest to argument after the invoice arrives.
This guide is written for commercial property managers, building owners and facility teams who need to write or review a scope for facades, glass, roofs or solar arrays. It includes a section-by-section checklist, wording you can adapt, and the points where bids most often diverge.
TL;DR
- List every surface by name and location (curtain wall, storefront, canopies, roof, arrays), and list what is excluded just as clearly.
- Specify the method and the access type (drone, lift, rope, scaffold, ground pole), because access drives cost, schedule and risk.
- Define “clean” in observable terms: no streaks, film, spots, drips or residue, checked by a named person on a set date.
- Put water control, tenant notice, insurance, safety documentation and change-order rules in the document, not in an email thread.
- Use the same scope for every bidder so prices compare line for line.
Table of Contents
- What an exterior cleaning scope of work does
- Step 1: Map the property before you write a line
- Step 2: List the surfaces and areas that are in scope
- Step 3: Specify the method, products and tools
- Step 4: Choose and describe the access method
- Step 5: Set frequency, schedule and windows of work
- Step 6: Control water, runoff and site protection
- Step 7: Define “clean” so you can accept or reject it
- Window cleaning scope: the specifics
- Roofs and solar arrays
- Responsibilities, exclusions and change orders
- A scope outline you can adapt
- Our perspective: scope the outcome, then let access be a choice
- Where drone cleaning fits in your scope
- How to compare bids against one scope
- FAQ
- Sources
What an exterior cleaning scope of work does
A scope of work is a contract attachment that turns a vague wish (“make the building look good”) into obligations both sides can verify. For exterior work it has three jobs.
It prices the job accurately. Contractors quote what they read. If your scope does not say whether the third-floor canopy glass or the parapet cap is included, one bidder will include it and another will not, and the cheaper bid will be cheaper only on paper.
It sets the finish. Weather, salt air, construction dust, bird droppings and hard water all leave different residue. The scope states the condition you expect at handover so “done” is not a matter of opinion.
It allocates risk. Work at height, runoff onto pedestrians and cars, and damage to sealants or finishes are all risks. The scope says who controls them, what insurance backs them and what happens if something goes wrong.

The document also has to handle local conditions that a generic template misses: storms or freezes that interrupt schedules, salt and mildew on coastal facades, flat roofs with biological growth, and solar arrays that lose output under pollen and dust.
Step 1: Map the property before you write a line
Walk the site, or review drawings, and make an inventory. The best scopes are built from an inventory rather than from a template, because the inventory forces you to notice what a template would skip.
Record, for each building or elevation:
- Height and number of stories, and which elevations face streets, pools, entrances or neighboring property.
- Glass type and area: curtain wall, storefront, punched windows, balcony glazing, skylights.
- Facade materials: painted stucco, concrete, metal panel, stone, EIFS, brick.
- Roof type and condition: tile, shingle, metal, flat TPO or EPDM.
- Rooftop equipment, solar arrays and anchor points.
- Ground conditions under the work: landscaping, parking, walkways, drains.
- Tenant sensitivities: restaurants with outdoor seating, medical suites, retail hours.
Take dated photos of the current condition. They become the “before” record that makes the acceptance check objective.
Step 2: List the surfaces and areas that are in scope
Public procurement documents are a useful model because they have to survive audits. A federal solicitation for window and glass cleaning on SAM.gov enumerates the surfaces it covers: curtain wall and storefront glass, entry doors and sidelights, canopies, accessible skylights, atrium glass, interior windows and glass, and frames, mullions, sills and tracks. Notice how specific the list is. It does not stop at “windows”.
Adapt that level of detail to your own building. A simple way to organize it is a table with one row per surface group.
| Surface group | What to name in the scope | Common exclusions to state |
|---|---|---|
| Glass | Curtain wall, storefront, punched windows, entry doors, sidelights, canopy glass, skylights | Interior glass, tinted film areas, damaged or cracked panes |
| Frames and trim | Frames, mullions, sills, tracks, weep holes | Gasket or sealant repair |
| Facade | Stucco, concrete, metal panel, stone, by elevation | Graffiti, rust remediation, paint failure |
| Roof | Tile, shingle, metal, flat membrane, by area | Leak repair, replacement, rooftop equipment servicing |
| Solar | Arrays by count or square footage | Electrical work, panel replacement |
| Ground level | Walkways, entry pads, signage | Parking structure floors, landscaping repair |
Give each row a location reference your contractor can find without you: elevation names (north, south), building letters, floor ranges, or marked-up drawings attached as an exhibit.
Step 3: Specify the method, products and tools
Tell the contractor how the work is to be done, at least to the level that affects results and risk.
For glass, a county specification on OpenGov names tools such as squeegees, microfiber towels and water with mild dish soap, and directs cleaners to start at the top and work down. Those are the right instincts to put in any glass scope: a defined tool list and a top-down sequence, so that drips from upper panes never land on glass that was already finished.
For other surfaces, state:
- Pressure range or soft-wash requirement. High pressure can drive water behind stucco, strip paint and damage tile. A soft-wash method uses low pressure with a cleaning solution that does the work chemically, which is the standard approach for roofs and painted facades.
- Water type. Purified or de-ionized water dries without spotting on glass and panels. If you want it, write it in.
- Chemicals. Require product names and safety data sheets, and prohibit anything that can harm sealants, coatings, anodized frames or landscaping.
- Surface-specific restrictions. For example, no walking on tile roofs without protection, or no abrasive pads on coated glass.
A scope that dictates every brush stroke is overkill. A scope that says nothing about method invites the cheapest possible approach.
Step 4: Choose and describe the access method
Access is the biggest cost and risk variable on any exterior job, so name it, or ask bidders to propose it and justify the choice.
The traditional options are:
- Ground-level reach: water-fed poles and sprayers, practical for the first few stories.
- Aerial lifts: good for mid-rise work where ground conditions allow.
- Suspended platforms and scaffolds: permanent building maintenance units or temporary rigging.
- Rope descent: technicians working from anchors on the roof.
- Drones: unmanned aircraft carrying a washing system, flown by a certificated pilot.
Each has regulatory implications. OSHA’s powered platforms fact sheet explains that the standard covers installations permanently dedicated to building maintenance, including window cleaning, and that it does not apply to temporary suspended scaffolds, which fall under 29 CFR Part 1910 Subpart D. The same fact sheet says a competent person must train operators to recognize and prevent hazards, use fall-arrest systems and follow safe platform procedures. If your building has a permanent platform, your scope should require proof of that training.
For rope or positioning-system work, OSHA’s personal fall protection rule calls for window anchors installed 42 to 51 inches above the sill and capable of supporting at least 6,000 pounds. A related requirement shows up in federal scopes: the Ann Arbor VA draft statement of work on SAM.gov has the facility provide the contractor with the current-year anchor inspection, which is the kind of responsibility split your scope should settle in writing.
If drones are an option, require that the operator holds the FAA remote pilot certificate that Part 107 requires for commercial small-drone flights. Then ask for the operator’s insurance, flight plan, and how they handle airspace checks, wind limits and keep-out zones around people and traffic.
Step 5: Set frequency, schedule and windows of work
Frequency is where scopes quietly go wrong. State it per surface, not once for the whole building.
Typical patterns look like this, adjusted to your site’s exposure:
- Street-level and entry glass: often the most frequent, because tenants and visitors see it daily.
- Upper glass and curtain wall: a recurring cycle, commonly set by season and by how quickly your site gets dirty.
- Facade soft-wash: periodic, driven by mildew, algae and salt.
- Roofs: periodic, and ideally paired with inspection.
- Solar arrays: scheduled around dust, pollen and output tracking.
There is no universal number. Coastal and heavily trafficked sites need shorter cycles than inland, shaded ones. Use your before photos and the first cycle’s results to tune the interval, and write the review into the contract.
Also write the logistics:
- Allowed working hours and days, and blackout periods such as events or tenant move-ins.
- Weather rules: what wind or storm conditions pause work, and how rescheduling is done without penalty.
- Notice to tenants: who sends it, how many days ahead, and what it says.
- Duration: how many days the job should take, and what counts as a delay.
This is also where access choice shows in the schedule. Work that takes several days of rigging and scaffold setup can sometimes be completed in a single day with a drone crew, which is why we ask bidders to state the planned duration rather than just a price.
Step 6: Control water, runoff and site protection
Exterior cleaning puts water and cleaning solution on surfaces you did not intend to touch. The scope should treat that as a deliverable.
The Ann Arbor VA draft on SAM.gov requires exterior-window runoff to be removed to prevent staining on lower windows and walls. That one line is worth copying in spirit. Add the rest of the picture for a commercial site:
- Pedestrian and vehicle protection: cones, barricades or spotters, plus timing around peak foot traffic.
- Landscaping: cover, pre-wet or rinse plants when chemicals are used, and restrict products that harm them.
- Drains and stormwater: no chemical discharge to storm drains, and a requirement to follow applicable local rules.
- Doors, vents and air intakes: closed or shielded during work.
- Adjacent property: buffer zones and wind limits so overspray does not reach neighbors, cars or pool decks.
- Pre-existing damage: document it before starting so it is not blamed on the contractor, or hidden by them.
Step 7: Define “clean” so you can accept or reject it
This is the section that prevents arguments. Use observable criteria and a named inspector.
The SAM.gov notice for glass cleaning requires glass to be clean, streak-free and spot-free, with frames and surrounding areas free of excess water and debris and no drips, runoff or residue. The Ann Arbor VA draft similarly asks that cleaned surfaces be free of film, smudges, foreign matter, streaks and stains. Both describe the finish rather than the effort.
A usable acceptance clause includes:
- The standard: no streaks, spots, film, drips or residue on glass; no visible algae, mildew or staining on cleaned facade and roof areas; frames and sills free of debris.
- How it is viewed: from a stated distance and angle, in normal daylight, from the ground or a defined vantage point.
- Who inspects: a named representative of the owner or manager.
- When: within a set number of days after completion, before final payment.
- Remedy: the contractor re-cleans deficient areas at no charge within a set period.
- Evidence: dated before-and-after photos or video by elevation, delivered with the invoice.
Documentation is not decoration. It protects both sides: you see proof of what was done, and the contractor has proof of the condition they found.
Window cleaning scope: the specifics
If your job is mainly windows, the same structure applies with a few extra decisions. The county specification on OpenGov covers inside and outside windows at listed locations, including atrium and multi-story window walls and interior sills, and says frames and sills are cleaned. Use that as a prompt for your own list.
Decide and write down:
- Inside, outside or both, and which floors or suites.
- Hard-to-reach glass: atriums, skylights, canopies, high curtain wall, balcony glass.
- Frames, sills, tracks and mullions: included or not.
- Screens and blinds: usually excluded unless stated.
- Hard-water or mineral deposits and paint overspray: treat as restoration, priced separately.
- Film, tint and coatings: note them so the wrong tools are not used.
- Count or area: a pane count or square footage that bidders can price from, with a rule for how disputes about counts are resolved.
Roofs and solar arrays
Roof and solar work belong in the same scope only if you spell out the differences.
For roofs, name the material (tile, shingle, metal, flat TPO or EPDM), the areas, and the method. State that cleaning is not repair: leaks, failed flashing or damaged tiles found during the work are reported, not fixed, unless a separate authorization exists. If you are also writing a roofing contract, what a roofing scope of work covers helps you keep repair and cleaning responsibilities from overlapping.
For solar arrays, state array count or total area, the water type, the no-contact or soft-contact approach, and a rule against cleaning when panels are hot or conditions are unsafe. Require that the contractor note cracked glass or loose hardware. If you track production, ask for before-and-after readings. Our page on commercial solar panel cleaning describes how we handle arrays.
Responsibilities, exclusions and change orders
Most disputes live in this part, so give it its own section.
Contractor responsibilities to list:
- Labor, equipment, water and products unless you provide any of them.
- Certified operators and documented training. The Ann Arbor VA draft requires employee-signed training documentation and safety data sheet copies for the contracting officer’s representative.
- Insurance certificates naming you as additional insured, with limits you specify.
- Cleanup and waste handling.
Owner responsibilities to list:
- Roof and building access, including keys, badges and elevator use.
- Anchor inspection records where relevant.
- Water and power if the contractor needs them.
- Tenant notice, or approval of the contractor’s notice.
- Securing sensitive areas.
Exclusions to list, in plain words:
- Repairs of any kind.
- Removal of paint, graffiti, rust or hard-water etching.
- Interior work.
- Anything not on the inventory.
Change orders: state that extra work needs written approval and a price before it starts. Include a unit rate for additional glass or roof area so the extra cost is known in advance.
Termination and warranty: how either side exits, and how long the contractor stands behind the results.
A scope outline you can adapt
Use this order. Each heading should have two to six lines under it.
- Project summary: property, address, contacts, purpose.
- Inventory and exhibits: surface table, drawings, photos.
- Tasks by surface: glass, facade, roof, solar, ground level.
- Methods and materials: tools, pressure, water, chemicals, SDS.
- Access and safety: access type, training, fall protection, certificates, airspace rules for drones.
- Schedule: working hours, duration, weather, tenant notice.
- Site protection: runoff, landscaping, vehicles, pedestrians, pre-existing damage.
- Acceptance: standard, inspector, timeline, re-clean remedy, documentation.
- Responsibilities and exclusions: owner and contractor.
- Pricing and changes: unit basis (per square foot, per array, per pane), fixed or not, change order process.
- Insurance, term and warranty.
Our perspective: scope the outcome, then let access be a choice
We clean commercial facades, glass, roofs and solar arrays across the United States with drones flown by FAA Part 107 certified pilots, carrying soft-wash and de-ionized water systems, so we read a lot of scopes. The same mistake appears again and again: the document prescribes the access method before anyone asks whether it is necessary. A scope that says “scaffold” or “rope access” in the task list locks you into the slowest and highest-risk option, and every bidder prices it that way.
We suggest writing the scope around the surface, the finish and the proof, and asking bidders to state the access method, duration and insurance they propose. Compare those side by side. Where a building is tall, the surface is large and the ground is busy, removing workers from height changes the risk picture, the tenant disruption and often the schedule from days to one day.
We also push for two things owners tend to skip: dated before-and-after documentation by elevation, and a fixed price against a defined square footage or array size. They make the invoice checkable and the acceptance simple.
— Eliot
Where drone cleaning fits in your scope
If your building is tall, hard to rig, or sits on a busy site, ask bidders to price drone-based soft-wash alongside conventional access. We clean facades, glass, roofs and solar arrays up to 320 feet (about 29 stories) per staging position without scaffolding, lifts or rope access. Contact us, or send us your inventory and we will quote against your scope on exteriordronewashing.com.
How to compare bids against one scope
Send the identical document and inventory to every bidder, and ask for the same pricing format. Then check:
- Does each bid cover every surface in the inventory? Missing rows explain most low bids.
- Is the access method named, and is it appropriate?
- Are insurance certificates and operator qualifications attached?
- Is the price fixed against a stated quantity, with unit rates for changes?
- What is the stated duration and tenant impact?
- How is the finish verified, and what is the re-clean remedy?
- What documentation is delivered?
A bid that cannot answer these is not cheaper, only less defined.
FAQ
What is the difference between an exterior cleaning scope of work and a quote?
The scope defines the work: surfaces, methods, frequency, standards and responsibilities. The quote attaches a price to that scope. Writing the scope first lets you compare quotes fairly, because every bidder is pricing the same thing.
Should the scope require a specific cleaning method?
Require the constraints that protect the building, such as soft-wash on roofs and painted facades, pure water on glass and no harmful chemicals. Leave the rest to the bidder, and ask them to state their access method and duration. That keeps you from paying for scaffolding when a safer, faster option exists.
How do I define a clean finish for glass and facades?
Use observable criteria: no streaks, spots, film, drips or residue, with frames and surroundings free of excess water and debris. Name who inspects, from what vantage point and within how many days. Back it with dated before-and-after photos.
Who is responsible for safety documentation?
The contractor should provide training records, safety data sheets, insurance certificates and, for drone work, the pilot’s FAA certification. The owner should provide access, anchor inspection records where relevant and tenant notice. Put each item on one side or the other in the scope.
How often should exterior cleaning be scheduled?
It depends on exposure, so set frequency per surface rather than for the whole building. Entry glass is usually cleaned more often than upper facades or roofs, and coastal sites need shorter cycles than inland ones. Review the interval after the first cycle using your photos.