A handful of US cities require owners of taller or older buildings to have the exterior walls inspected on a fixed cycle. In those cities exterior work is scheduled, not discretionary: an inspection engineer needs a clean, visible surface, and the report that follows often calls for washing before repairs are priced.

The list below is built from the same sourced data as our state and city pages. Each entry summarizes the ordinance and links the source it was read from. New York City's Facade Inspection and Safety Program (Local Law 11) is covered on the New York state page.

The ordinances, by state

Each entry is the rule as the city or state publishes it, with the source it was read from. City entries link to that city's page; state entries link to the state page.

California

  • California (state page)

    San Francisco's Building Facade Inspection and Maintenance Ordinance requires buildings five or more stories tall to undergo a comprehensive facade inspection by a California-licensed architect or engineer, resubmitted every 10 years, with added checks for buildings 15 or more stories.

    Source
  • San Francisco, CA

    Initial facade reports in San Francisco fall due by construction date: buildings completed before 1910 by the end of 2021, 1910 to 1925 by the end of 2023, 1926 to 1970 by the end of 2025 and 1971 to 1997 by the end of 2027.

    Source

Illinois

  • Illinois (state page)

    Chicago's facade ordinance requires a critical examination of exterior walls on buildings 80 feet or taller, at intervals of 4 to 12 years depending on the wall's construction category, performed by a registered architect or structural engineer.

    Source
  • Chicago, IL

    Between critical examinations, Chicago's exterior wall rules call for ongoing inspections every second, fourth or sixth year depending on the wall's construction category. Ongoing inspection reports are due November 1.

    Source

Massachusetts

  • Massachusetts (state page)

    Boston's Building Code, sections 9-9.12, requires exterior wall inspections of buildings over 70 feet tall or classified as high rise at least once every 5 years, administered by the city's Inspectional Services Department.

    Source
  • Boston, MA

    Boston's Inspectional Services Department lists a facade certificate among the certificates a building of seven stories or taller must hold, and states that a property lacking a required certificate is in violation of City ordinances.

    Source

Michigan

  • Michigan (state page)

    Detroit's Property Maintenance Code, Section 8-15-34(d)(8), requires owners of buildings five stories or taller to have exterior walls and roof-mounted structures inspected by a competent person at least every five years.

    Source
  • Detroit, MI

    Detroit calls its facade filing a Wall Report: a signed and sealed engineering report on the facade and exterior components, sent to the city's Commercial Annual office. The next report is due every 5 years from the date of BSEED approval.

    Source

New York

  • Manhattan, NY

    Under the Facade Inspection and Safety Program, owners of properties higher than six stories must have exterior walls and appurtenances inspected every five years by a Qualified Exterior Wall Inspector, who files an electronic report with the Department of Buildings through DOB NOW: Safety.

    Source

Ohio

  • Ohio (state page)

    Columbus requires a critical observation of facades every five years on buildings 20 years or older that stand within 10 feet of a public way, with an architect or engineer required for downtown buildings of three or more stories.

    Source
  • Cleveland, OH

    Cleveland's facade inspection must be done by a qualified inspector: an Ohio-licensed design professional certified for the facade's elements, or an accredited special inspector or inspection agency. Results go to the city on its Summary Inspection Report of Exterior Walls and Appurtenances form.

    Source
  • Columbus, OH

    Columbus City Code section 4109.073 sets the critical observation report rule, with related sections 4109.075 and 4109.077. On buildings of 3 or more stories the observation must be done by, or under the direct supervision of, an architect or structural engineer.

    Source

Pennsylvania

  • Pennsylvania (state page)

    Philadelphia's Property Maintenance Code (Section PM-304.10) makes the owner of any building six or more stories in height, or with any appurtenance over 60 feet, responsible for retaining a professional to inspect the exterior walls and appurtenances periodically and report to the owner; a summary of the inspection must be submitted to the Department of Licenses and Inspections.

    Source

Wisconsin

  • Wisconsin (state page)

    Milwaukee Code of Ordinances Sec. 275-32-13 requires buildings five stories or taller and more than 15 years old to undergo a professional facade inspection on a cycle of 5 to 12 years depending on wall construction.

    Source
  • Milwaukee, WI

    Milwaukee's facade inspection ordinance, Section 275-32-13 of the city code, took effect August 18, 2001. Owners of buildings five stories or taller and older than 15 years must have a registered professional engineer or architect carry out a critical examination of the facade.

    Source

Cleaning on the inspection cycle

Drone soft-washing suits inspection-cycle buildings because it needs no scaffolding, swing stage or rope anchors on the facade being inspected, and it produces 4K aerial before/after footage that can sit beside the inspection report.

A tethered drone reaches up to 320 ft, about 29 stories, from one staging position; taller towers are worked from podiums, setbacks or the roof. Commercial work is quoted per square foot at our published national rate of $0.12–$0.25, fixed after a free site survey, and a maintenance contract on the inspection cycle runs 20–30% below the one-off price per visit. See how we price and where drones need permits.

Questions

Does drone cleaning satisfy a facade inspection ordinance?

No. The ordinances require an inspection by a licensed professional, not a cleaning. Cleaning before the inspection gives the engineer a clean surface to read, and cleaning after the report removes the staining the report photographed.

Which cities are on this list, and why not others?

Only cities whose ordinance we have opened and cited appear here. A city with a well-known program but no primary source on file is left out until one is added; the page grows as the data does.

How is inspection-cycle cleaning priced?

The same way as every other job: per square foot at our published national rate, fixed after a free site survey, with a maintenance contract available for buildings that wash on the inspection cycle.

Get a free site survey before the inspection

Tell us the building and the inspection date. We survey it for free and send a fixed price.

See your price, then book a free site survey

Free site survey, then a fixed price. No scaffolding, no lifts, no minimum charge.

FAA Part 107 · $1M/$2M liability · $5M umbrella · published national rate

Published rate: $0.12–$0.25 per sq ft, fixed after a free site survey. Add a size to see the total.

We call or text the same business day to book the survey.

By submitting your phone number you agree to receive texts from Exterior Drone Washing about your request. Msg & data rates may apply. Reply STOP to opt out.

CallQuoteText Us